Order of execution
1. Lubricate all friction surfaces with Litol-24 grease.
2. Insert into rubber collar 19 (see fig. Shift control mechanism (type I)) liners 18.
3. Press the lower hemisphere 17 assembled with the spring 12 and the upper hemisphere 7 into the rubber cage 19.
4. Insert the rubber clip 19 with its tapered part into the support 21.
5. Perform a similar subassembly for the type II movement.
6. Install support cover 16.
7. Install the bracket 15 on the support 21 according to the previously made marks and tighten the fastening bolts 14.
8. Install spring 4 and washer 3 and fix it with retaining ring 2.
9. Screw on gear lever knob 1.
10. Install the rubber clip 7 on the mechanism of type II (see pic. gear lever (type II)) assembled with a hinge into the body 5, then install the metal ring 11 and the rubber support 27.
11. Before installing the gearbox, it is necessary to adjust the length of the rod 32 (see fig. Shift control mechanism (type I)) or thrust 2 (see pic. Shift control mechanism (type II)).
12. Remove rod 32 (see fig. Shift control mechanism (type I)) from ball pins 30 and 33.
Adjust rod length 32 (b = 134 mm) with nut 31.
13. Install rod 32 on ball pins 30 and 33.
Visitor comments