Withdrawal
Place the car on a lift.
Disconnect the wire from the negative battery terminal.
Establish clips on hoses of a supply of a cooling liquid to an oil cooler of a transmission.
Disconnect the hoses from the oil cooler.
Disconnect the flexible speedometer drive shaft from the gearbox
Attach a hoist or some kind of support to the engine and hang the engine.
Remove the starter and unscrew the torque converter mounting bolts, as well as the three drive flange mounting bolts.
Remove the right wheel drive shaft shield.
Remove the shield of the right transmission mount bracket.
Disconnect the front wheel drives.
Remove the muffler intake pipe mounting bracket.
Remove the muffler intake pipe.
Remove the counter support, return spring and disconnect the selector lever cable.
Remove the throttle control rod.
Loosen the positive shift cable and disconnect it from the transmission bracket.
Unscrew the oil filler tube, after substituting a container for the drained oil under the gearbox.
Loosen the nuts securing the gearbox to the front subframe.
Install a suitable jack and slightly raise the gearbox.
Turn out the lower bolts of fastening of a transmission to the block of the engine.
Slightly lift the gearbox off the engine, but in such a way that the torque converter remains in the clutch housing.
Drive the right wheel drive shaft forward.
Disconnect the gearbox from the engine block
Fix the torque converter in the crankcase.
Installation
Before installing the automatic transmission, correctly position the torque converter on the transmission shaft and ensure that it remains in place when installing the transmission.
Bring the gearbox to the attachment points.
Install the lower gearbox-to-engine block bolts.
Install the transmission mount brackets to the front subframe.
Install and connect the transmission oil filler pipe.
Attach the positive shift cable to the transmission.
Install the throttle control rod.
Attach the CC Lever Lever Cable and Install the Return Spring and Counter Support
Install the muffler downpipe with a new gasket between the flanges.
Install the wheel drive shafts.
Establish shrouds of a shaft of a drive of the right wheel and the right bracket of a suspension bracket of a transmission.
Install and tighten torque converter drive flange bolts.
Install starter.
Install and tighten the upper gearbox-to-engine block bolts.
Disconnect the engine hoist mountings.
Attach the flexible speedometer drive shaft.
Attach the hoses to the oil cooler and remove the clamps from the hoses.
Restore the coolant level in the expansion tank.
Fill the automatic transmission with oil.
Visitor comments