Install a new cylinder head gasket «oben» («top») towards the plane of the head.
Insert bolts 8 and 10 into the holes of the cylinder head (see photo) or install dowel pins in the holes for these bolts in the cylinder block, then install the cylinder head.
Install new washers and cylinder head bolts.
Gradually tighten the cylinder head bolts in the order shown (see photo) and tightening torques.
The order of tightening the cylinder head bolts and the location of the valves: Vp - inlet valves, Vp - exhaust valves
Install the camshaft drive belt as above.
On engine models «DR» And «DS» manufactured before September 1985, check and, if necessary, adjust the valve clearances.
Install the alternator and coolant pump drive belt, tension bar and adjust the belt tension.
Install the exhaust manifold and muffler exhaust pipe flange.
Reinstall intake manifold and carburetor.
Connect the cooling and heating hoses to the cylinder head.
Install the cylinder head cover.
Attach vacuum hoses to the carburetor, connect the plug connectors, electrical wires and carburetor control cables.
Install the air filter.
Install spark plugs and high voltage wires.
Fill the engine cooling system with coolant.
Connect the wire to the negative terminal of the battery.
Start the engine, listen to its operation and, if necessary, adjust the ignition timing, carburetor and on engines of models «DR» And «DS» release until September 1985 thermal valve clearances.
Visitor comments