Note. Replace the gaskets every time the cylinder head is removed.
Install a new cylinder head gasket «oben» («top») towards the plane of the head.
Insert bolts 8 and 10 into the holes of the cylinder head (see photo) or screw the dowel pins into the holes for these bolts in the cylinder block, then install the cylinder head.
Note. Bolts 8 and 10 must be screwed in first, as the holes for them in the cylinder head and its gasket have a smaller diameter than the holes for other bolts.
Install new washers and cylinder head bolts.
Gradually tighten the cylinder head bolts in the order shown (see photo), in four steps:
- 1st reception: 4 kgf·m;
- 2nd reception: 6 kgf·m;
- 3rd reception: 7.5 kgf·m;
- Step 4: turn 90°.
In the future, the installation of the cylinder head is carried out in the reverse order of removal. After installing the cylinder head, fill the engine cooling system with coolant. Connect the wire to the negative terminal of the battery Start the engine and check its operation, and if necessary, adjust the ignition timing. engine idling, valve clearances.
Visitor comments