Remove the doors on the respective side. Drill out the resistance welding points at the junction of the pillar panel with the floor of the body. In the upper part of the rack, provide a cut at a distance of approximately 50 mm from the roof, and in the lower part - 20 mm from the floor. Drill out the resistance welding points of the rack and amplifier. Prepare the joints for welding and prime with a zinc-containing primer. Install and secure a new part, check the gaps. Install the door and determine the location of the hinge welding. Weld the top and bottom ends of the strut and the reinforcement by resistance welding, and weld the holes by arc welding in a protective atmosphere. Weld the hinges by arc welding in a protective environment with a continuous seam. Treat the inner surfaces with liquid wax.
Visitor comments