Interconnecting rail length adjustment
- 1 - roller bracket;
- 2 - rail drive lever;
- 3 - rod;
- 4 - connecting rail;
- 5 - adjusting bolt
The connecting rail must be adjusted if the idle speed has been adjusted.
Order of execution
1. Warm up the engine. The oil temperature must be at least +70°C.
2. Turn the lever so that the hole in the lever matches the hole in the bracket.
3. Fix the lever by inserting a rod with a diameter of 3.5 mm into the holes of the lever and bracket (e.g. drill).
4. Loosen the bolt and set the length of the rack so that the fuel pump lever touches the stopper.
5. Tighten the bolt and remove the rod.
Visitor comments