2. Unscrew the bolt (2 in illustration 4.5 Chapter 8).
3. Give the nuts (2 in the illustration) and remove the stabilizer.
8.3. Fastening the stabilizer clamps
4. Installation is performed in the reverse order of dismantling the components. The stabilizer clamp fastening nuts should first be tightened only by hand, and should be finally tightened only after tightening the stabilizer riser fasteners. The stabilizer clamp bushings should be dry.
