Sedan
685. Ground connection point 1 at the front on the right side member.
638. Ground connection point on the right A-pillar.
688. Connection point with mass 2 on the central tunnel.
687. Connection point with mass 1 on the central tunnel.
730. Ground connection point 1 on the rear right wheel arch.
62. Ground connection point on the right C-pillar.
51. Ground connection point in the luggage compartment on the right.
624. Ground contact near the starter battery.
61. Ground connection point on the left C-pillar.
50. Point of contact with ground in luggage compartment on the left.
602. Ground connection point in footwell, left.
639. Ground connection point on the left A-pillar.
12. Ground connection point in the motor. compartment on the left.
615. Ground connection point on the left side of the shock absorber strut.
671. Ground connection point 1 at the front on the left side member.
Avant
685. Ground connection point 1 at the front on the right side member.
638. Ground connection point on the right A-pillar.
688. Connection point with mass 2 on the central tunnel.
687. Connection point with mass 1 on the central tunnel.
730. Ground connection point 1 on the rear right wheel arch.
654. Ground connection point on the right D-pillar.
624. Ground contact near the starter battery.
61. Ground connection point on the left C-pillar.
50. Point of contact with the luggage mass. compartment on the left.
51. Ground connection point in the luggage compartment on the right.
602. Ground connection point in footwell, left.
639. Ground connection point on the left A-pillar.
12. Ground connection point in the motor. compartment on the left.
615. Ground connection point on the left side of the shock absorber strut.
671. Ground connection point 1 at the front on the left side member.
Jumper installation locations and tightening torque
615. Ground connection point on the left side of the shock absorber strut
Installation location: on the front left shock absorber strut. Tightening torque: 9 Nm.

12. Ground connection point in the engine compartment on the left
Installation location: between the shock absorber strut and the water drainage box, front left. Tightening torque: 9 Nm.

685. Ground connection point 1 at the front of the right side member
Installation location: on the front, right side member, behind the wheel arch liner. Tightening torque: 20 Nm.

639. Ground connection point on the left A-pillar
Installation location: behind the A-pillar trim on the left, at the bottom. Tightening torque: 9 Nm.

638. Ground connection point on the right A-pillar
Installation location: behind the A-pillar trim on the right, below. Tightening torque: 9 Nm.

687. Connection point with mass 1 on the central tunnel
Installation location: left side, center, tunnel. Tightening torque: 9 Nm.

688. Connection point with mass 2 on the central tunnel
Installation location: on the right side, center, tunnel. Tightening torque: 9 Nm.

730. Ground connection point 1 on the wheel arch, rear right
Installation location: next to the rear right fender liner, under the threshold. Tightening torque: 9 Nm.

61. Ground connection point on the left C-pillar
Installation location: under the C-pillar trim on the left, near the rear. glass. Tightening torque: 9 Nm.

62. Ground connection point on the right C-pillar
Installation location: under the C-pillar trim on the right, near the rear. glass. Tightening torque: 9 Nm.

50. Ground connection point in the luggage compartment on the left
Installation location: under the side trim in the luggage compartment. compartment on the left, near the wheel arch. Tightening torque: 9 Nm.

51. Ground connection point in the luggage compartment on the right
Installation location: under the side trim in the luggage compartment. compartment on the right, near the wheel arch. Tightening torque: 9 Nm.

61. Ground connection point on the left C-pillar "arrow"
Installation location: under the trim of the left side wall behind the C-pillar. Tightening torque: 9 Nm.

654. Ground connection point on the right D-pillar
Installation location: under the D-pillar trim, top right. Tightening torque: 9 Nm.

624. Ground contact near the starter battery
Installation location: under the trunk floor covering, on the right side next to the starter battery. Tightening torque: 18 Nm.

602. Ground connection point in the left footwell "arrow"

Installation location: under the floor mat in the footwell on the driver's side.

[This article was copied from the website: AUDImanual.ru]
