Table of contents: 685. Ground connection point 1 at… ↓ 672. Ground connection point 2 at… ↓ 671. Ground connection point 1 at… ↓ 615. Ground connection point on the… ↓ 12. Ground connection point in the… ↓ 609. Ground connection point on the… ↓ 602. Connection point with mass in… ↓ 639. Ground connection point on left… ↓ 638. Ground connection point on the… ↓ 687. Connection point with mass 1 on… ↓ 688. Connection point with mass 2 on… ↓ 624. Ground contact near starter… ↓ 675. Ground connection point 2 in… ↓ 666. Ground connection point on the… ↓ 676. Ground connection point 2 in… ↓ 653. Ground connection point on left… ↓ 50. Ground contact point in the… ↓ 654. Ground connection point on the… ↓ 51. Ground connection point in the… ↓ 53. Ground connection point in the… ↓ 612. Ground connection point in the… ↓
Ground connection points
- 609. Ground connection point on the right in the water drainage box
- 638. Ground connection point on the right A-pillar
- 688. Connection point with mass 2 on the central tunnel
- 687. Connection point with mass 1 on the central tunnel.
- 51. Ground connection point in the trunk on the right
- 654. Ground connection point on the right D-pillar
- 666. Ground connection point on the roof, rear right
- 612. Ground connection point in the center of the trunk lid
- 53. Ground connection point in the trunk lid on the right
- 676. Ground contact point 2 in the left trunk
- 50. Ground contact point in the trunk on the left
- 653. Ground connection point on left D-pillar
- 624. Ground contact near starter battery
- 675. Ground connection point 2, right in trunk
- 602. Footwell ground connection point, left
- 639. Ground connection point on left A-pillar
- 672. Ground connection point 2 at the front on the left side member
- 12. Ground connection point in the engine compartment on the left.
- 615. Ground connection point on the left side of the shock absorber strut
- 671. Ground connection point 1 at the front on the left side member
- 685. Ground connection point 1 at the front on the right side member
685. Ground connection point 1 at the front on the right side member

Installation location: On the front right side member, behind the wheel arch liner.
Tightening torque: 20 Nm.
672. Ground connection point 2 at the front on the left side member "arrow"

Installation location: Front, on the left side member, below. Tightening torque: 20 Nm.
671. Ground connection point 1 at the front on the left side member

Installation location: On the side member next to the front left wheel arch. Tightening torque: 9 Nm.
615. Ground connection point on the left side of the shock absorber strut

Installation location: On the front left shock absorber strut. 1 Tightening torque: 9 Nm.
12. Ground connection point in the engine compartment on the left.

Installation location: Between the shock absorber strut and the water drainage box, front left. Tightening torque: 9 Nm.
609. Ground connection point on the right in the water drainage box

Installation location: In the water drainage box. Tightening torque: 9 Nm.
602. Connection point with mass in the footwell on the left "arrow".

Installation location: Under the floor mat in the driver's side footwell.
639. Ground connection point on left A-pillar

Installation location: Behind the A-pillar trim on the left, at the bottom. Tightening torque: 9 Nm.
638. Ground connection point on the right A-pillar

Installation location: Behind the A-pillar trim on the right, at the bottom. Tightening torque: 9 Nm.
687. Connection point with mass 1 on the central tunnel

Installation location: Left side, center, tunnel. Tightening torque: 9 Nm.
688. Connection point with mass 2 on the central tunnel

Installation location: On the right side, center, tunnel. Tightening torque: 9 Nm.
624. Ground contact near starter battery

Installation location: Under the boot floor covering, on the right next to the starter battery. Tightening torque: 18 Nm.
675. Ground connection point 2 in the trunk on the right "arrow"

Installation location: Under the trunk floor covering, on the right next to the starter battery. Tightening torque: 9 Nm.
666. Ground connection point on the roof, rear right

Installation location: Under the roof cross member trim, rear. Tightening torque: 9 Nm.
676. Ground connection point 2 in the trunk on the left "arrow"

Installation location: Under the trim in the trunk on the left.
653. Ground connection point on left D-pillar

Installation location: Behind the D-pillar trim on the left. Tightening torque: 9 Nm.
50. Ground contact point in the trunk on the left

Installation location: Behind the D-pillar trim on the left. Tightening torque: 9 Nm.
654. Ground connection point on the right D-pillar

Installation location: Behind the D-pillar trim on the right. Tightening torque: 9 Nm.
51. Ground connection point in the trunk on the right

Installation location: Behind the D-pillar trim on the right. Tightening torque: 9 Nm.
53. Ground connection point in the trunk lid on the right

Installation location: On the rear window frame on the right, behind the trim.
612. Ground connection point in the center of the trunk lid

Installation location: On the trunk lid at the top, next to the third brake light.
(The original article is posted on the resource: AUDIMANUAL.ru)
