Withdrawal
AAE, ABK, AAD and AAR engines
1. Set the piston of cylinder N1 to the TDC position.
2. Disconnect the wires and the Hall sensor connector from the ignition distributor.
3. Loosen the mounting screws, release the clamps and remove the distributor cover. Check that the slider is aligned with the N1 cylinder mark on the body.
4. Mark the installation position of the distributor on the cylinder block.
5. Unscrew the fixing bolt and remove the distributor. Remove the sealing ring.
ACE engine
1. Set the piston of cylinder N1 to the TDC position.
2. Disconnect the wires and the Hall sensor connector from the ignition distributor.
3. Remove the protective screen, unscrew the fixing screws and remove the distributor cover. Check that the slider is aligned with the N1 cylinder mark on the body.
4. Mark the installation position of the distributor on the cylinder block.
5. Loosen the fixing screws and remove the distributor. Remove the sealing ring.
Examination
1. Inspect the O-ring and replace if necessary.
2. Inspect the drive gear and replace the distributor if worn.
Installation
1. Check that the piston of cylinder N1 is in the TDC position.
AAE, ABK, AAD and AAR engines
2. Check that the tongue on the input shaft is parallel to the axis of the crankshaft.
3. Install a new o-ring and install the distributor in place. Check that the slider is aligned with the N1 cylinder mark on the body, and also that the marks on the distributor body and cylinder block match.
ACE engine
4. Install a new o-ring and install the distributor in place. Check that the marks made earlier coincide and tighten the fixing screws. Further installation is carried out in the reverse order of removal.
Visitor comments