Order of execution
1. Remove the generator.
2. Loosen the fixing screws (indicated by arrows).
3. Release the clamps.
4. Remove the cover.
5. Loosen the fixing screws and remove the brush holder/voltage regulator.
6. Measure the length of the alternator brushes at points A and B. Replace the holder with brushes if necessary.
7. Inspect the surface of slip rings (indicated by arrows) and replace them if necessary.
8. The assembly of the generator is carried out in the reverse order.
Visitor comments