Cooling system pump, thermostat, fittings 1/5/10. Bolt. 9 Nm; 2. Bolt 20 Nm; 3. Coolant pump belt drive pulley; 4. Coolant pump with seal; 6. Connecting pipe of the cooling system hose; 7/8. Gasket. Replace; 9. Thermostat. Check
Coolant supply pipes 1. Coolant supply pipe, rear. Remove and install together with "pos. 17"; 2/16/18. Bolt. 9 Nm; 3. Sealing ring. Replace; 4. Connecting hose; 5/7. Bolts. 9 Nm; 6. Coolant pipe, front; 8. Sealing ring. Replace; 9. Mounting bracket; 10. Coolant temperature sensor "G62"; 11/13. Sealing cuff. Replace; 12. Cooling system hose; 14. Sealing ring. Replace; 15. Coolant pipe, upper; 17. Coolant supply pipe, rear. Remove and install together with "pos. 1"; 19. Coolant hoses
Coolant pump after engine shutdown "V51" 1. Cooling system hose; 2. Holder; 3. Bolts. 9 Nm; 4. Cooling system hose.; 5. Bolt. 4 Nm; 6. Coolant bleeding system pump after engine shutdown "V51" (only for vehicles for use in hot countries)
[The article was copied from the website «AudiManual.ru»]
