Charge air cooling system 1. Intercooler; 2/4/5/7/15/17/19/23. Hose clamp, reinforced, 5.5 Nm; 3. The air duct hose to the turbocharger must be cleaned of oil and grease before installation; 6. The air duct hose to the intake manifold should be cleaned of oil and grease before installation; 8. Seal ring, replace; 9. Charge pressure sender -G31-; 10. Bolt, 5 Nm; 11. Rubber tip; 12. Bushing; 13. Nut, 9 Nm; 14. Rubber tip; 16. Air guide tube; 18. The air duct hose from the intercooler should be cleaned of oil and grease before installation; 20. Bolt, 7 Nm; 21. Resonator; 22. Rubber tip; 24. The air duct hose to the resonator should be cleaned of oil and grease before installation
Charge air cooling system 1. Intercooler; 2/4/5/7/15/17/19/23. Hose clamp, reinforced, 5.5 Nm; 3. The air duct hose to the turbocharger must be cleaned of oil and grease before installation; 6. The air duct hose to the intake manifold should be cleaned of oil and grease before installation; 8. Seal ring, replace; 9. Charge pressure sender -G31-; 10. Bolt, 5 Nm; 11. Rubber tip; 12. Bushing; 13. Nut, 9 Nm; 14. Rubber tip; 16. Air guide tube; 18. The air duct hose from the intercooler should be cleaned of oil and grease before installation; 20. Bolt, 7 Nm; 21. Resonator; 22. Rubber tip; 24. The air duct hose to the resonator should be cleaned of oil and grease before installation
Visitor comments