1. Threaded sleeve (4 things.)
2. Retainer
3/4. Combination bolt, 1.5 Nm
5. Lid
6. Threaded sleeve (2 pcs.)
7. B-pillar trim. Remove cover. Remove cover downwards. Remove screws from threaded bushings. Remove trim from B-pillar. Installation: Fit trim from above into bracket and push it at distance -a- = 0.7 mm to roof frame. Screw in the bolts. Insert the cover from below and press it into the holder. Dimension -b- = 1.5 mm
8. Combination bolt, 1.5 Nm
9. Mount
10. Cover. When installing, first insert into the B-pillar trim from below, then press into the mount. Adjust the dimension -b- = 1.5 mm by moving the trim, while setting the distance -a- to the roof frame to be no more than 0.7 mm
Visitor comments