Withdrawal
Before disconnecting the battery, find out if you have a radio activation code.
Turn off the ignition and disconnect the wire «masses» from the battery.
Drain the coolant.
Remove the toothed belt from the camshaft pulleys.
Remove the pulley from the right camshaft.
Remove the front section of the intake manifold.
Pic. 3.3–58. The location of the screws for fixing the left (1), top (2) and right (3) toothed belt covers
Unscrew the screws and remove the top 2 (see fig. 3.3–58). toothed belt housing section
Turn away screws and remove left 1 and right 3 casings of a gear belt.
Pic. 7–20. The location of the bolts for fastening the front section of the pipe of the cooling system of the diesel engine 2.5 l
Loosen the clamps, unscrew the three bolts and the front section of the cooling pipe from the front of the engine (see fig. 7–20).
Installation
Installation is carried out in the reverse order of removal, taking into account the following.
Lubricate a new O-ring with G 012 A8 D and install on the front section of the coolant pipe.
Install the toothed belt.
Fill with coolant.
Visitor comments